Add GreenLight, YellowLight, RedLight templates and BlackRoad Codex integration

Co-authored-by: blackboxprogramming <118287761+blackboxprogramming@users.noreply.github.com>
This commit is contained in:
copilot-swe-agent[bot]
2025-12-24 07:23:30 +00:00
parent a826b5f783
commit 372c1b1e22
7 changed files with 1215 additions and 0 deletions

182
REDLIGHT.md Normal file
View File

@@ -0,0 +1,182 @@
# 🔴 RedLight Status
**Status:** STOP / ERROR / UNSAFE TO PROCEED
## ⚠️ CRITICAL ALERT ⚠️
This repository has a **RedLight** status, indicating critical issues that **MUST** be resolved before any work proceeds. The project is currently in an unsafe state and requires immediate attention.
## RedLight Conditions
A repository enters RedLight status when:
- 🛑 Critical tests are failing
- 🛑 Build is broken
- 🛑 Critical security vulnerabilities detected
- 🛑 Data loss or corruption risk
- 🛑 Production incidents occurring
- 🛑 Deployment blockers present
- 🛑 Major breaking changes unresolved
- 🛑 Compliance violations identified
- 🛑 System instability detected
## ⛔ STOP ALL ACTIVITY
### Immediate Actions Required
**DO NOT:**
- ❌ Merge any pull requests
- ❌ Deploy to any environment
- ❌ Make non-emergency changes
- ❌ Integrate with other systems
- ❌ Create new features
- ❌ Publish releases
**DO:**
- ✅ Focus on resolving RedLight issues
- ✅ Implement emergency fixes only
- ✅ Coordinate with team/agents
- ✅ Document all issues clearly
- ✅ Test fixes thoroughly
- ✅ Communicate status frequently
## Critical Issues
### MUST FIX IMMEDIATELY
Document all RedLight issues here:
1. **🚨 CRITICAL ISSUE:**
- **Description:**
- **Impact:** CRITICAL
- **Risk:** High/Severe
- **Assigned To:**
- **Status:**
- **ETA:**
2. **🚨 CRITICAL ISSUE:**
- **Description:**
- **Impact:** CRITICAL
- **Risk:** High/Severe
- **Assigned To:**
- **Status:**
- **ETA:**
## Agent Collaboration Status
### BlackRoad Agents - Emergency Mode
- 🤖 **Cora** - Code Review Agent: Emergency reviews only
- 🤖 **Alice** - Migration Architect: HALTED
- 🤖 **Lucidia** - Documentation Expert: Emergency docs
- 🤖 **Caddy** - CI/CD Orchestrator: LOCKED
- 🤖 **Cece** - Code Quality Guardian: Emergency mode
- 🤖 **Aria** - Architecture Advisor: Emergency consultation
- 🤖 **Silas** - Security Sentinel: ACTIVE - Priority response
- 🤖 **Gaia** - Infrastructure Manager: Emergency mode
- 🤖 **Tosha** - Test Automation Expert: Emergency testing
- 🤖 **Roadie** - Release Manager: LOCKED - No releases
- 🤖 **Holo** - Holistic System Monitor: ALERT mode
- 🤖 **Oloh** - Optimization Specialist: SUSPENDED
All agents are in emergency mode, focusing exclusively on resolving RedLight conditions.
## BlackRoad Codex Integration
Repository marked as UNSAFE in BlackRoad Codex:
- 🔍 Code search returns warnings
- 📊 Analysis flagged as high-risk
- 🔬 Verification shows critical failures
- 📚 Knowledge graph marked as unsafe
- 🚫 Excluded from production references
## Incident Response
### Response Team
- **Incident Commander:** TBD
- **Technical Lead:** TBD
- **Security Lead:** TBD
- **Communications Lead:** TBD
### Communication Protocol
- **Frequency:** Continuous updates
- **Channels:** All stakeholders alerted
- **Escalation:** Immediate
- **Documentation:** Real-time logging
### Root Cause Analysis
1. **Identify** what went wrong
2. **Document** the timeline
3. **Analyze** contributing factors
4. **Implement** preventive measures
5. **Review** with team
## Resolution Path
### Phase 1: Stabilization (URGENT)
- [ ] Identify all critical issues
- [ ] Triage by severity and impact
- [ ] Assign emergency response team
- [ ] Implement immediate fixes
- [ ] Verify system stability
### Phase 2: Testing & Validation
- [ ] Run full test suite
- [ ] Perform security scans
- [ ] Validate all fixes
- [ ] Check for regressions
- [ ] Document all changes
### Phase 3: Recovery
- [ ] Review all systems
- [ ] Update monitoring
- [ ] Implement safeguards
- [ ] Conduct post-mortem
- [ ] Update processes
### Phase 4: Transition to YellowLight
- [ ] All critical issues resolved
- [ ] Systems stable and tested
- [ ] Team approval obtained
- [ ] Documentation complete
- [ ] Monitoring in place
## Monitoring & Alerts
**Alert Level:** MAXIMUM
**Monitoring:** 24/7 continuous
**Response Time:** Immediate
**Escalation:** Automatic
## Post-Incident Requirements
Before moving to YellowLight:
1. Complete root cause analysis
2. Implement all critical fixes
3. Pass full test suite
4. Security clearance obtained
5. Team sign-off received
6. Lessons learned documented
7. Prevention measures in place
## Prevention
To prevent future RedLight status:
- Implement better testing
- Enhance monitoring
- Improve CI/CD checks
- Regular security audits
- Code review processes
- Dependency management
- Incident response drills
---
**Last Updated:** 2025-12-24
**Status Set By:** BlackRoad Traffic Light System
**Severity:** CRITICAL
**Next Review:** Continuous until resolved
**Emergency Contact:** [Your emergency procedures]
## 🚨 THIS IS A PRODUCTION INCIDENT 🚨
All hands should focus on resolving RedLight conditions. Normal development is suspended until safety is restored.